Description
Primavera Contractor has small and mid-sized contractors in mind. Allowing users to begin planning and scheduling immediately right out of the box. Primavera Contractor is easy and intuitive to navigate. Primavera Contractor drag and drop activity bars to add constraints or modify your plan, and still take full advantage of Critical Path Scheduling required for your contract requirments. Contractors Interactive, flexible PERT and Gantt charts make it simple for general contractors to communicate with the client as well as other designers and contractors. Future Period Bucket Planning allows Planner Schedulers to enter a custom distribution, or spread, per resource, role assignment, and model resource requirements in a way that truly reflect how the work is planned and being performed.
* Primavera Contractor is limited to 2000 activities so it is not suitable for all projects.
Technical Skills
- Microsoft Windows (32-bit): Windows 2003 Server R2 sp2, Windows XP Professional sp2, Windows Vista Business Edition sp1, Windows 7, * Windows 8, Windows 10 * It has been identified that some Windows 8 environments require “Run the program without getting help”
- Microsoft Windows x64 (64-bit): Windows 7, Windows 10
Primavera Contractor Benefits:
An affordable solution specifically built for contractors that makes scheduling, reporting, and progress planning simple. As a contractor, the ability to build an effective schedule that everyone on your project can understand and use is crucial. Primavera Contractor allows you to continually communicate and provide accurate and up-to-date reports to the project manager as necessary throughout the project to ensure you get paid on time.
Benefits:
- Plan and schedule projects quickly and easily
- Identify driving relationships using activity network diagrams with trace logic
- Easily create attractive and fully customizable graphics including Gantt charts, activity network diagrams, time scale logic diagrams and histograms
- Control budgets, changes, and estimates at completion to ensure a successful project delivery
- Export to XER to share with P6 power users


Reviews
There are no reviews yet.